October 18, 2018 Repair, Salesforce Transbay Transit Center, San Francisco, California
|
A Hole
A hole was opened up in the metal covering above the street so that hydraulic lifts could be installed. Notice that, because buses no longer ran beside the terminal, the traffic light for those buses was disabled.
October 18, 2018 Repair • Salesforce Transbay Transit Center • 201 Mission Street • San Francisco California • (Photo taken 15:14:28 Thursday 18 October 2018) • (Photo posted Wednesday 21 November 2018) • © 2018 Bryan Costales #C18_7946 Add a comment or report a mistake
|
Yellow Lifts
A set of four yellow hydraulic lifts were installed along the center of the street. The were needed to support the structure after a crack was found in one of the major horizontal i-beams.
October 18, 2018 Repair • Salesforce Transbay Transit Center • 201 Mission Street • San Francisco California • (Photo taken 15:15:10 Thursday 18 October 2018) • (Photo posted Wednesday 21 November 2018) • © 2018 Bryan Costales #C18_7947 Add a comment or report a mistake
|
Hold Up I-Beam
The hydraulic lifts held up the horizontal i-beam at the point where it had cracked.
October 18, 2018 Repair • Salesforce Transbay Transit Center • 201 Mission Street • San Francisco California • (Photo taken 15:15:21 Thursday 18 October 2018) • (Photo posted Wednesday 21 November 2018) • © 2018 Bryan Costales #C18_7949 Add a comment or report a mistake
|
Closed
The Salesforce Transit Center was closed and locked up tight.
October 18, 2018 Repair • Salesforce Transbay Transit Center • 201 Mission Street • San Francisco California • (Photo taken 15:16:07 Thursday 18 October 2018) • (Photo posted Wednesday 21 November 2018) • © 2018 Bryan Costales #C18_7952 Add a comment or report a mistake
|
More Jacks
More jacks held up the horizontal i-beam of the next street over. This was a precaution, anticipating the same stresses over both streets would crack this other beam too.
October 18, 2018 Repair • Salesforce Transbay Transit Center • 201 Mission Street • San Francisco California • (Photo taken 15:20:33 Thursday 18 October 2018) • (Photo posted Wednesday 21 November 2018) • © 2018 Bryan Costales #C18_7957 Add a comment or report a mistake
|
Short Lifts
A set of four small hydraulic lifts held up two long vertical i-beams.
October 18, 2018 Repair • Salesforce Transbay Transit Center • 201 Mission Street • San Francisco California • (Photo taken 15:20:56 Thursday 18 October 2018) • (Photo posted Wednesday 21 November 2018) • © 2018 Bryan Costales #C18_7958 Add a comment or report a mistake
|
Another Horizontal I-Beam
A second horizontal i-beam was supported over a second street. Notice how the metal of this i-beam had been polished smooth so that it could be easily inspected.
October 18, 2018 Repair • Salesforce Transbay Transit Center • 201 Mission Street • San Francisco California • (Photo taken 15:21:02 Thursday 18 October 2018) • (Photo posted Wednesday 21 November 2018) • © 2018 Bryan Costales #C18_7959 Add a comment or report a mistake
|
Almost Art
The short hydraulic lifts formed a lovely counterpoint to the "Do Not Enter" sign. Almost an accidental work of art.