4th Street Construction, Central Subway, SFMTA MUNI Metro, Third Street Extension, San Francisco, California
|
Center Dug Up
The center of 4th street was dug up to prepare for concrete and rail tracks. This project extended from the start of the subway under the freeway, to the Caltrain Station.
4th Street Construction • Central Subway • SFMTA MUNI Metro • Third Street Extension • San Francisco, California • (Date Photographed: 10:52:22 Tuesday 10 October 2017) • (Date Published: Thursday 23 November 2017) • © 2017 Bryan Costales #C17_5584 Add a comment or report a mistake
|
Construction Equipment
A small piece of construction equipment was parked at the Harrison Street end of one dug up portion.
4th Street Construction • Central Subway • SFMTA MUNI Metro • Third Street Extension • San Francisco, California • (Date Photographed: 10:55:19 Tuesday 10 October 2017) • (Date Published: Thursday 23 November 2017) • © 2017 Bryan Costales #C17_5588 Add a comment or report a mistake
|
Cross Streets Still Open
At the this time, construction was only between cross streets. The cross streets would be closed later to run tracks across them.
4th Street Construction • Central Subway • SFMTA MUNI Metro • Third Street Extension • San Francisco, California • (Date Photographed: 10:55:58 Tuesday 10 October 2017) • (Date Published: Thursday 23 November 2017) • © 2017 Bryan Costales #C17_5589 Add a comment or report a mistake
|
Size Of Construction
This was a large construction project, for merely connecting the subway to the T-line. This view was from Townsend Street with the end of construction at King Street a block behind.