|
||
EMX BRT
With The Lane Transit District (LTD)
The Lane Transit District running one Bus Rapid Transit (BRT) line and constructing a second in Eugene, Oregon. EMX BRT Bus • EMX BRT Construction • EMX West Extension |
EMX BRT Bus, Of The Lane Transit District (LTD) The Lane Transit District running one Bus Rapid Transit (BRT) line and constructing a secondin Eugene, Oregon. This is one of the buses that runs on that current line. |
|
EMX BRT Construction, For The Lane Transit District (LTD) The Lane Transit District is constructing a second BRT lineout 11th Avenue in Eugene, Oregon. |
|
EMX West Extension, Of The Lane Transit District (LTD), Eugene, Oregon In addition to the fixed bus routes, LTD operates a bus rapid transit line from downtown Eugene to the Gateway area in north Springfield, via downtown Springfield. The BRT line, named the Emerald Express (EmX), began operations in January 2007. The first corridor connects downtown Eugene to downtown Springfield and runs primarily along Franklin Boulevard. A second EmX corridor, the Gateway EmX extension, began service in January 2011. The Gateway EmX extension connects downtown Springfield and the Gateway area in north Springfield. LTD chose bus rapid transit after a review process during which several transportation options, including light rail, were considered. It concluded that this was the best option for Eugene-Springfield's size and current transportation needs. LTD is currently in the process of expanding EmX to the West Eugene area.[from wikipedia] |
home • contact • topic guide • top 25 • photos • video • writing • blogs • upload • terms • privacy |